Playbooks

Apply a Playbook to a Trip

Applying a playbook to a trip pre-populates the Execution page with the playbook's components. You preview what will be added before confirming.

Applying a playbook to a trip adds the playbook's components to the trip's Execution page. This gives you a structured set of steps to work through during the trip.

Before you start

  • The playbook must have Active status. Draft playbooks do not appear in the Apply Playbook flow.
  • You can apply a playbook at any point during a trip — before it starts, during, or after.

How to apply a playbook

  1. Open the trip and go to the Trip Dashboard.
  2. Click ← Dashboard in the breadcrumb, then navigate to Apply Playbook from the trip navigation, or use the direct link from the Trip Dashboard's Playbook panel.
  3. The Apply Playbook page shows all your active playbooks.
  4. Click Select → next to the playbook you want to apply.
  5. A preview loads showing every component that will be added.

Reviewing the preview

The preview table shows each component with:

  • Component title and whether it is Required
  • Phase — which stage of the trip this step belongs to
  • Status — one of:
    • New — will be added to the trip
    • Duplicate — a similar item already exists; will be skipped
    • Keep Both — a similar item exists but both will be kept
  • Include toggle — you can deselect optional components before applying

Required components always have their toggle set to "Always" — they cannot be deselected.

Confirming the apply

  1. Review the component list and deselect any optional components you do not want.
  2. The count at the bottom shows how many components will be applied.
  3. Click Confirm and Apply →.

After applying, you are redirected to the trip's Execution page, which now shows the playbook steps organized by phase.

What happens after applying

  • The Execution page shows all applied components grouped by phase.
  • Required components are marked with a "Required" label.
  • You can mark steps as Complete, In Progress, Skipped, or Blocked as you work through the trip.
  • The Playbook panel on the Trip Dashboard shows progress.

Applying a playbook when creating a new trip

You can also apply a playbook at trip creation time. On the New Trip page, if you select the Use a Playbook creation method, you choose a playbook before the trip is created. The playbook is applied automatically when the trip is created.

Tips

  • If no active playbooks appear, check that your playbooks have been activated. Go to Playbooks, open the playbook, and change its status from Draft to Active.
  • You can apply only one playbook per trip at a time. Applying a second playbook adds its components alongside the first.
  • Duplicate detection prevents the same step from being added twice if you apply a playbook that overlaps with existing trip content.

Last reviewed: July 15, 2025